Topographic Survey

18 Orchard Lane, Sampleford, Massachusetts

What the ground does, drawn as lines of equal height. Contours, spot elevations, a benchmark and a drainage swale — and why the lines bunch together where the hill is steep.

TOPOGRAPHIC SURVEY 18 ORCHARD LANE, SAMPLEFORD, MASSACHUSETTS 140 150 160 160 170 180 190 DRAINAGE SWALE 186.9 171.1 169.8 155.3 144.0 159.3 155.1 BM #1EL. 155.08 EXISTINGDWELLINGF.F. 172.4 GRAVEL DRIVE EDGE OF WOODS N 04080 FT SCALE 1" = 40' CONTOUR INTERVAL 2 FEET INDEX CONTOURS EVERY 10 FEET VERTICAL DATUM NAVD 88, HELD AT BM #1 ELEVATIONS IN US SURVEY FEET LEGEND INDEX CONTOUR INTERMEDIATE CONTOUR SPOT ELEVATION BENCHMARK DRAINAGE SWALE EDGE OF WOODS BUILDING SURVEY LIMIT NOTES 1. FIELD SURVEY COMPLETED 09/14/2026. 2. CONTOURS INTERPOLATED FROM FIELDSHOTS AND BREAKLINES. 3. CONTOURS ARE NOT A SUBSTITUTE FORSPOT GRADES AT CRITICAL POINTS. 4. NO BOUNDARY DETERMINATION IS MADEBY THIS PLAN. PREPARED UNDER THE DIRECTION OF PROFESSIONAL LAND SURVEYOR P.L.S.NO. 00000 TOPOGRAPHIC SURVEY SCALE1" = 40' DATE09/14/2026

What this sheet shows you

This is a teaching drawing of a fictional parcel. The licence number is blank and the seal reads NO. 00000, so nothing here is a recordable document or a surveyor's certification.